An inside-the-fence look at BMO Tower massive concrete foundation pour: Slideshow


Construction crews completed a nearly 20-hour concrete foundation pour Saturday for the new BMO Tower in downtown Milwaukee, a key milestone in the building of the 25-story office tower at North Water and East Wells streets. Check out the attached slideshow to get an exclusive look behind the fences that blocked most of the work from public view.

During the long endeavor, about 670 concrete trucks arrived at the construction site at three-minute intervals after waiting in a long line on East Wells…

Previous Inside Sip & Purr, Milwaukee's first cat cafe: Slideshow
Next PNC planning 'national digital expansion' with an 'ultra-thin branch network'