In design and construction, the days of having a single master builder have passed.
Today’s buildings are far too complex, and the technology being used is maturing at such a rapid clip that having one person overseeing every aspect of a project is no longer an option.
To adequately meet the needs of modern builds, all aspects of a project’s design – from accessibility to zero emissions – need to be addressed at the start of the process.
This is where design-forward construction management…